Berthing Information

PORT INFORMATION FOR SINGAPORE LNG TERMINAL

JETTY : PRIMARY BERTH (OSLN1)

MAXIMUM SHIP DIMENSION ACCEPTABLE

Size (capacity) 120,000 TO 265,000 cu.m
LOA 345m
Beam 57m
Draught 13m
Displacement 90,000t Min design
Displacement 180,000t Max design
SIDE OF BERTHING Both

BERTHING / UNBERTHING : DAY AND NIGHT TIME (24HR OPERATION)

CHART DATUM AT BERTH

17.7 m

WATER LEVEL IN METRE

HHWL +4.75  
MHWS +2.93  
Mean Sea Level (MSL) = (MWL) +1.63  
MLLW +1.20  
LAT -0.18  
WAVE

SIGNIFICANT WAVE HEIGHT, INCLUDING 0.5M SHIP WAKE - RETURN PERIOD IN METRES

0.86 1 year
1.02 10 years
1.26 100 years
TIDES NORTH & SOUTH GOING Max cross current 0.7 knots (at entrance of Temasek Basin)
DOCK WATER DENSITY 1025 kg/m3

OTHER

Approved Port (Facility) Security Plan in Place? Y
Is the terminal part of a public port? N
Ballast Water Management – Discharge requirement Clean Ballast Only
Marine Exclusive Zones (Seaward) 170m centered on Vapour arm
Sea Temperature 30 C
Air Temperature 23-33 C
Time Zone +8 UT
Remarks
  • Port regulated by MPA, compulsory reporting to VTIS,
  • Pilotage provide by PSA (Marine) Pte Ltd.
  • Only one ship movement at any one time in Temasek Basin.
FACILITIES FO GO LN2 Water (FW/DW) Vapour Return Cooldown, Inerting, unloading, loading Dirty Oil Reception Garbage Reception Ballast Water Reception
Availability (Y/N) N N N N Y Gassing Up, Cooldown, unloading & loading N N N
Max quantity N/A N/A N/A N/A N/A Unloading / Reloading 12,000m3/hr N N N

WEATHER LIMITATIONS

LIMITS Wind Speed (knots) / Any direction Wave Height (in basin) (metres) Visibility (nautical miles)
Limit of Berthing >15 <1.0 >1.0
Limits for cessation of cargo operations 20 gusting to 25 >1.5%  
Limits for disconnection of arms 25 gusting to 30 >1.5  
Limits for leaving berth >30 >1.5  
Limits for resumption of cargo operations <20 <1.5  
Remarks: Frequent squalls (The Sumatra’s) prominent during SW monsoon (peak May - June period). Haze is common during June - September (reduction in visibility expected)

TUGS REQUIREMENT

Ship’s Size (LOA in metres) Number Bollard pull (t) Manouvering Guard Tug (after alongside) Remarks
>/=180 4 45 Berthing / Unberthing 1 (with full FiFi) Arrange by shipper. Line handlers arrange by shipper
<180 2 45 Berthing / Unberthing 1(with Full FiFi)