Berthing Information

Berthing Information

Ship Shore Compatibility

A vessel nominated to call at the SLNG Terminal is required to undergo a Ship Shore Compatibility Study (SSCS), as part of SLNG’s vessel approval process. The SSCS shall be submitted through SLNG’s Vessel Compatibility Assurance Screening and Approval (VCASA) digital application. Upon  successful completion of the SSCS and approval, the vessel remains physically compatible for berthing at the SLNG Terminal, except when modifications are made to the vessel that impact its compatibility with our Terminal. It is the vessel operator’s responsibility to notify SLNG of such modifications. An approved vessel is also required to undergo revalidation every three years.

Please contact MarineOps@SLNGCorp.com for more information, or if you wish to submit an SSCS request.

Compatible Vessels List

SLNG maintains a “Compatible Vessels List” that contains a list of vessels that have undertaken the SSCS and are currently deemed compatible with the SLNG Terminal. Click here to view the list.

Note:

i.  The information provided in this list is for convenience only. SLNG does not assume any responsibility or duty of care in respect of, or warrant, guarantee or make any representation as to, such information (including its accuracy, completeness or adequacy), and will not be liable for any errors or omissions in such information in the list.

ii.  Users of this list should contact MarineOps@SLNGCorp.com or the vessel’s operator for further details of vessel’s approval status and acceptability conditions.

Jetty: Primary Berth (OSLN1)

Maximum Ship Dimension Acceptable
Size (capacity) 120,000 TO 265,000 cu.m
LOA 345m
Beam 57m
Draught 13m
Displacement 90,000t Min design
Displacement 180,000t Max design
SIDE OF BERTHING Both
Berthing / Unberthing
DAY AND NIGHT TIME (24HR OPERATION)
Chart Datum at Berth
17.7m

Jetty: Secondary Berth (OSLN3)

Maximum Ship Dimension Acceptable
Size (capacity) 60,000 TO 265,000 cu.m
LOA 345m
Beam 57m
Draught 12.5m
Displacement 90,000t Min design
Displacement 180,000t Max design
SIDE OF BERTHING Both
Berthing / Unberthing
DAY AND NIGHT TIME (24HR OPERATION)
Chart Datum at Berth
13.5m

Jetty: Secondary Berth (OSLN3/SSLNG)

Maximum Ship Dimension Acceptable
Size (capacity) 2,000 TO 10,000 cu.m
LOA NA
Beam NA
Draught 12.5m
Displacement NA
Displacement NA
SIDE OF BERTHING Both
Berthing / Unberthing
DAY AND NIGHT TIME (24HR OPERATION)
Chart Datum at Berth
13.5m
Water Level in Metre
HHWL +4.75 -
MHWS +2.93 -
Mean Sea Level (MSL) = (MWL) +1.63 -
MLLW +1.20 -
LAT -0.18 -

WAVE

SIGNIFICANT WAVE HEIGHT, INCLUDING 0.5M SHIP WAKE - RETURN PERIOD IN METRES

0.86 1 year
1.02 10 years
1.26 100 years

TIDES

NORTH & SOUTH GOING Max cross current 0.7 knots (at entrance of Temasek Basin)
DOCK WATER DENSITY 1025 kg/m3
Other
Approved Port (Facility) Security Plan in Place? Y
Is the terminal part of a public port? N
Ballast Water Management – Discharge requirement Clean Ballast Only
Marine Exclusive Zones (Seaward) 170m centered on Vapour arm
Sea Temperature 30 C
Air Temperature 23-33 C
Time Zone +8 UT

Remarks

  • Port regulated by MPA, compulsory reporting to VTIS
  • Pilotage provide by PSA (Marine) Pte Ltd.
  • Only one ship movement at any one time in Temasek Basin.
Facilities FO GO LN2 Water FW/DW Vapour Return Cooldown, Inerting, unloading, loading Dirty Oil Reception Garbage Reception Ballast Water Reception
Availability
(Y/N)
N N N N Y Gassing Up, Cooldown, unloading & loading N N N
MAX Quality N/A N/A N/A N/A N/A Unloading / Reloading 12,000m3/hr N N N

Weather Limitations

Limits Wind Speed (knots) / Any direction Wave Height (in basin)(metres) Visibility (nautical miles)
Limit of Berthing >15 <1.0 >1.0
Limits for cessation of cargo operations 20 gusting to 25 >1.5% -
Limits for disconnection of arms requirement 25 gusting to 30 >1.5 -
Limits for leaving berth >30 >1.5 -
Limits for resumption of cargo operations <20 <1.5 -
Remarks Frequent squalls (The Sumatra’s) prominent during SW monsoon (peak May - June period). Haze is common during June - September (reduction in visibility expected)

Tugs Requirement

Ship’s Size (LOA in metres) Number Bollard pull (t) Manouvering (nautical miles) Guard Tug (after alongside) Remarks
>/=180 4 45 Berthing / Unberthing 1 (with full FiFi) Arrange by shipper. Line handlers arrange by shipper
<180 2 45 Berthing / Unberthing 1 (with full FiFi)