Key Equipment Capacities
Key Equipment Capacities
Equipment | Capacities |
---|---|
LNG Storage Tanks | 3 x 180,000m3 and 1 x 260,000m3. Full Containment type |
Primary Jetty | Accommodates 120,000m3 to 265,000m3 LNG carriers |
Secondary Jetty | Designed for 60,000m3 to 265,000m3 LNG carriers, and modified to also reload 2,000m3 to 10,000m3 carriers |
Tertiary Jetty | Can accommodate up to 80,000m3 LNG carriers (Only civil structure completed. Topsides to be installed if there is viable business case.) |
Unloading / Reloading Facilities |
4 x 16” Marine Loading Arms per jetty, with provision to install a fifth at Primary Jetty should the need arise (2 x liquid, 1 x vapour return, 1 x hybrid) |
LNG/NG Pumps |
For each 180,000m3 Tank: 3 x Low Pressure In-Tank Pumps for LNG send-out 2 x LNG Reloading In-Tank Pumps for LNG reload For 260,000m3 Tank: 3 x Low Pressure In-Tank Pumps for LNG send-out 4 x LNG Reloading In-Tank Pumps for LNG reload Others: 11 x High Pressure Booster Pumps for send-out at ~40 barg pressure |
Vapour Handling System |
2 x Recondensers 4 x Boil-off Gas Compressors |
LNG Vapourisers |
7 x Seawater Open Rack Vapourisers 2 x Submerged Combustion Vapourisers |
Seawater Pumps | 6 x Seawater Pumps |
Metering Runs | 11 x Natural Gas Metering Runs |
LNG Truck Loading Facility | 1 x Pilot LNG Truck Loading Bay with a maximum loading rate of 50m3/h |